Founder & Managing Director, Vijay Infra
Over the past 15 years, Vijay Infra has evolved from a specialized sub-contractor into a premier heavy civil and trenchless utility engineering firm. Our growth is anchored in a relentless commitment to engineering precision, strict adherence to project timelines, and zero compromise on site safety.
"We do not merely lay cables or drill pipelines; we build the resilient core infrastructure that powers national communication, rail transport, and urban connectivity."
Looking ahead, our focus remains on expanding our heavy asset fleet with automated HDD technology and scaling our presence across all North-Eastern and Eastern states of India.
S&T signaling corridors, Quad/OFC trenching, and civil footings.
Trunk fiber optical networks, backhaul ducting, and POP civil sites.
State & Central PWD infrastructure development contracts.
Underground utility ducting, urban drainage, and road restoration.
Ductile Iron (DI) and HDPE trunk pipelines for urban supply.
Integrated site earthworks, power cabling, and drainage networks.
GPR underground mapping & route topography.
Engineering CAD drawings & statutory clearances.
Structural analysis & depth calculations.
Deploying rigs, machinery & field crews.
Precision HDD drilling or trenching.
Quality assurance & depth verifications.
Hydrostatic & OTDR optical loss tests.
As-built documentation & final certification.
Compliant with ISO 9001:2015, ISO 14001, and ISO 45001 international standards.
Mandatory protective gear, high-visibility apparel, and safety harnesses on all sites.
Toolbox talks conducted prior to every operational shift to identify site hazards.
Heavy Excavators
25-Ton Directional Rigs
Material Transport
Field Mobility Units
Fiber Jointing Kits
With strategic equipment yards and regional offices, Vijay Infra is equipped to mobilize heavy machinery across challenging hilly terrains, river basins, and rural corridors within 48 hours.
Interactive Operational Map View
"Vijay Infra executed our railway signaling trenching contract under tight line block schedules with exceptional accuracy."
"Their 25-Ton HDD drilling rig completed a complex riverbed crossing in record time without disturbing existing utilities."
"High standard of safety equipment and technical crew coordination during urban water pipeline excavation."
Mobilization begins for 120 KM signaling corridor in NFR zone.
Enhancing trenchless crossing capabilities across rocky strata.
Reaffirming zero-incident standards across all active project sites.
Includes machine fleet specifications, statutory licenses, and past contract credentials.